A 1950s hillside house with sage green board-and-batten siding and an all-black array across its low shingle roof, with dry hills behind

Solar and batteries

Solar panel installation in Los Angeles, permit to switch-on

We do solar panel installation on Los Angeles houses, with all-black panels set low and flush on your roof. Call (310) 299-9430 to book a free roof check.

About an hour at your house, on a day you pick. Your price comes inside your plan.

What we handle for you

  • We pull the permit and book inspections.
  • We deal with LADWP or Edison for you.
  • We call you back.

Installing the panels takes 1 or 2 days on your roof. The wait around those days belongs to the city's permit office and to your utility. One project manager handles both and texts you each time a step is done.

The permit and the utility's paperwork are ours, from the roof check to switch-on.

Is my house right for solar?

  • You own the house. We put solar on houses for the people who own them.
  • One side of your roof gets sun most of the day. That slope is clear of tall trees and taller neighbors.
  • The roof has years left in it. If it doesn't, you hear that at the roof check, with the roof work priced in the same plan.

What happens between your first call and switch-on

  1. We check your roof. The roof check takes about an hour and is free, on a day you pick. We measure the roof and look at the tiles or shingles where each mount would sit. Then we go through your main panel and a year of your bills with you.
  2. You get your design and your price. After the roof check, the panels are drawn on your roof and your price is inside the plan. The contract comes with the plan, so you can read every page before anyone asks you to sign.
  3. The permit comes next. We file once you sign. The city bills its permit fee to you directly, and your project manager gives you the figure before anything is filed. If the city asks for changes, we make them and file again, and you get a text the day it approves.
  4. The crew installs the panels. The crew flashes every mount under the roofing and paints the conduit to match your stucco. All we need from you is someone to let us in that morning.
  5. Then comes the inspection. We ask for it the day we finish and meet the inspector at the house. If your main panel is indoors, we'll ask you to be home for that hour.
  6. We switch you on. Your utility's paperwork goes in the day the inspection passes, and we keep after it until the OK lands. Then we show you where to see what your panels made.

One person, start to finish

One project manager runs your job and texts you at every step.

Callback
Send your address and we call you back.
Updates
A text each time a step is done, and a reply when you text in.

How the panels are fixed to a tile, shingle or flat roof

  • If your roof is clay or concrete tile. Tiles come up where each mount goes. The mount is fixed into the rafter below and flashed, then the tile is set back over it.
  • If your roof is composition shingle. Each mount gets a flashing that slides under the row of shingles above it, so rain runs off over the joint.
  • If your roof is flat. The panels usually sit on short stands, each one sealed into the roofing where it meets it.

A roof laid over an older one can change what the city asks for. We check for a second layer at the roof check and tell you before you sign.

What decides your solar panel cost, and how you can pay

The roof check is where your solar panel installation cost starts. The plan prices the house we measured, and the battery circuits you picked if you want one.

Your project manager goes through the price with you, at your table or on the phone.

If you want a battery too, a home battery designed with the panels goes in the same plan and on the same job.

Can I lease the panels or pay another way?

Ways to pay are cash, a solar loan, a lease or a PPA, and your plan shows the ones open at your address.

If something fails years from now

You still text the same number. If a panel, inverter or rail we installed fails within 25 years, we replace it ourselves. Leaks at our mounts are covered for the same 25 years.

It's written into your plan and your contract, and it stays with the house if you sell.

Two installers in harnesses roped to a roof anchor, kneeling on a red tile roof as they set a black solar panel on its rails

If you are still choosing between solar power contractors

How long until the panels are running?

On the roof, 1 or 2 days. The permit review and your utility's final OK run on their own clocks, so we don't print a total. Your project manager tells you which one you're waiting on and when we last chased it.

Will my main panel need replacing?

Sometimes. We look at yours at the roof check, and if it can't take solar as it stands, the new one goes in the same plan.

How do I compare solar power installers?

Compare the plan each one gives you for your address. Look for the panels drawn on your roof, each step and who does it, the price, the contract to read first, and how long the work is covered.

Call (310) 299-9430 or send us your address. We call you back.

We install solar panels in Santa Clarita, Anaheim, Burbank and Thousand Oaks.

Start your plan

Start with your address.

We call you back with your utility and the first step for your house.

The roof check and the plan are free. You pick the day we come out.

Your plan shows

  • Your utility and your permit office
  • Every step for your address, and who does it
  • Your project manager's name and mobile
  • Your price, with the contract to read first
(310) 299-9430Free roof check

Start your plan

Tell us where the house is. We call you back shortly to pick a time for the roof check.

Start your plan

What's on your roof, if you know, and anything else about the house.

Add your name, email, photos or address

Optional. Up to 3 photos of the job, 10 MB each.

or call (310) 299-9430

The roof check is free. Nothing is signed until you're ready.